411 S. Maple St.
Columbia, SC 29205
Developer/owner:
Architect(s): Studio2LR
General contractor: Don Blackstone Construction
Engineer(s):
Estimated completion date: Spring 2021
Estimated total cost of project:
Project description: This is the first Net Zero commercial building in Columbia. Its goal is to be a low-energy-use building, but also to serve as a learning tool for students at the school. As a STEAM building, it will house the campus science lab and art studio.